Cart(0)
Short-sleeve Tops, Shorts, Skirts and Sandals for Creating Dynamic Summer Looks
Short-sleeve Tops, Shorts, Skirts and Sandals for Creating Dynamic Summer Looks Short-sleeve Tops, Shorts, Skirts and Sandals for Creating Dynamic Summer Looks
Home Skirts Dresses
Chic Mermaid Spaghetti Straps Long Prom Dresses Pink Feather Elegantt Evening Dress sew0212
Chic Mermaid Spaghetti Straps Long Prom Dresses Pink Feather Elegantt Evening Dress sew0212
Size:
  • UsSize2
  • UsSize4
  • UsSize6
  • UsSize8
  • UsSize10
  • UsSize12
  • UsSize14
  • UsSize16
  • UsSize16W
  • UsSize18W
  • UsSize20W
  • UsSize22W
  • UsSize24W
  • Customersize
Color:
  • White
  • Black
  • Red
  • Colornamefromthecolorlink
  • Picturecolor

$ 85.16

$ 65.51

Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

Silhouette: Mermaid
Neckline: Spaghetti Straps
Hemline/Train: Short Train
Sleeve Length: Sleeveless
Back Details: Zipper
Fabric:Tulle

Color name:

Notice:

If the color box is not in your requirement, please check the . Please fill the color number in the comment box when you place the order.

Please note that all of the dresses are tailored from scratch including the standard sized dresses.How to measure:

When you choose "Customer size", please leave us a message about your bust, waist, hips, hollow to floor with bare foot, extra heels and other necessary measurements.

Size: standard size or custom size, if dress is custom made, we need to size as following

bust______ cm/inch
waist______cm/inch
hip:_______cm/inch
hollow to floor with bare foot:_______cm/inch
extra heels:_______cm/inch
shoulder to shoulder :_______cm/inch (measured from back of shoulder)
shoulder to bust :_______cm/inch (measured from middle shoulder to nipple)
shoulder to waist :_______cm/inch (measured from middle of shoulder to natural waist)
nipple to nipple:_______cm/inch
armhole:__________cm/inch
Sleeve length:__________cm/inch

Please select the corresponding color name in the color link, we will confirm with you again when we receive your order.Please be aware that slight color aberration of the dress and the color shown on screen is unavoidable because of many factors such as brightness of your monitor and light brightness.

Delivery time:

SHIPPING GUIDE
1.Shipping Methods We Offer:

DHL,TNT, UPS, Fedex etc.

All dresses will be shipped via express. Normally you will receive your order in 3-7 days after it was shipped.

We ship to all over the world. If you can not find your country when check out, please .

2.Delivery Time.

Delivery Time = Processing Time Shipping Time

Standard delivery, you will receive the dress in 20-30 days after payment.

Rush delivery, you will receive it in 15-20 days after payment.


If you need the dress urgently. Please note us the date you need the dress, we will put your order on prior schedule and make sure you receive it on time.
For some styles with complicate beading and hand work, it may take few more days for processing.

Our advantage:

Our goal is to provide complete one stop shopping for all brides, bridesmaids and all special occasion events. We strive to provide you with the most current selection, the most complete size range (Us size 2 to 24W, custom size), the best prices and the largest variety of styles. Please just assure it and we will make a perfect dress for your big event!

You May Also Like
Unavailable
Cart
Short-sleeve Tops, Shorts, Skirts and Sandals for Creating Dynamic Summer Looks
Your cart is currently empty.